Showing posts with label bob's sweater. Show all posts
Showing posts with label bob's sweater. Show all posts

Monday, November 23, 2009

Good weekend

Saturday: Nancy and I had a great time at The Mannings trying out wheels and browsing at yarn and tools and fibers, etc.

Nancy will be getting a Kromski Sonata! She bought some fiber to play with so that as soon as the wheel arrives, she can begin.

I was so good! I needed some size 1 circs for my winter sock knitting and bought those. I finally took the plunge and bought Addi lace turbos. I didn't buy anything else. I have plans for a sweater for after the new year but will buy at my LYS and didn't allow myself to get sidetracked into buying anything else - sock, lace or other yarn or books.

We made a day of it and once I got home, I was not motivated to do anything. We ate a wonderful dinner, I did the dishes and then sat and knitted.

Sunday was a morning of chores and then football watching. The Ravens almost beat Indy. Almost. Sigh.

The He Gansey front was almost completed. Then I discovered that, as I had feared, I missed some shaping instructions and I have to rip 15 or so rows. Bummer. It looks good, though. Bob's warm fishing hat is complete except for pompom making. One Spiraling Corialis sock is ready to be bound off. The purple Sunshine is longer - I think I have about 6 more rows and then it's time for some hell work. Swatches for a new year KAL (Mondo Cable sweaters by Chic Knits) are in the works.

The bag that my MIL had started for me (that I finished knitting) now has straps and can be used.

I enjoyed the sunshine yesterday and it's a good thing. I think we won't see any more sun this week. Ugh.




Thursday, November 19, 2009

Small projects today

I was right. The hat did make a good travel project. I will transfer the ribbing to size 1 needles and re-knit it. First I have to find/buy more size 1 circs.

Tonight is knit nite at my LYS. I plan to work on the hat (DH hopes to go fishing again this weekend and there's a chance I can get it finished by then) and the Sunshine socks. I won't try to knit on the He Gansey tonight - I have to get settled into the pattern in a quiet place before I can think about knitting on it in public. I would knit the sleeves - double moss stitch - but I have to pick up the stitches and knit down, so the front has to be finished first. That will make excellent weekend knitting. I expect to be able to finish the front this weekend.

DH is with the audiologist now for his second "fitting". She will test and make adjustments to try to help him get the best use from the device. He also gets homework. giggle.

Monday, April 27, 2009

Sweater Blocking photos

This is a close up  of the stitch patterns.


Here's one sleeve. As you can see, it only has the dark blue on the cuff. I like that.
Now the back. I have already attached front to back at the shoulders. It made blocking a little trickier but I managed. 
The fronts.
The entire sweater, blocking on the back deck. It was lovely outside by that time of the day.


This is my new project - I have swatched for the Elemental boatneck in IK.( I have not abandoned the white cotton sweater for DH but I need something else to knit for hand and wrist rest and for my sanity. Ribbing, it seems, is even more boring that stockinette. I suppose that's because I have to pay attention to it instead of being able to knit on autopilot.)  Here is my swatch.

These are the photos on the IK site and in the magazine. They seem to be the same thing.

The charts in the magazine, however, would have you knit something else. I am knitting what is in the photos. I did try the charts but didn't like the pattern that resulted. The twisted rib chart, for instance, appears to tell me to k1tbl, K1 and repeat. No purl. I tried it but didn't like it.

The linen stitch chart tells me to K1, K1wyf, k2 and repeat for the first row. I tried that and didn't like the way that looked either, so I reverted to the linen stich I have seen before - K1, K1wfy repeat. Much better, and, I believe, what is in the photos of the garment. I have emailed IK but haven't heard from them yet. I also emailed the desinger but haven't heard from her yet, either. It was the weekend, so I have to be more patient. The lace chart appears to be correct. I hope the rest of the instructions are right, and that I have hit all of my major snags in this project at the beginning. ; )

ETA I just had confirmation from the designer that I was right about the charts- they are wrong. The designer says that she submitted the patterns without charts- the stitch patterns were written out, not graphed. Now I am free to knit. Yippee!

It's my birthday so I plan to take it easy, rest my foot and enjoy the day with knitting in hand.

Tuesday, March 03, 2009

West coast - Stitches. East coast - snow. Is that fair?

Well. Snow. Somwhere around 8 inches of it. It was beautiful. It was cold. It was heavy. I am thankful for the inventor of snow blowers. I do not use noisy machines when I can do something quietly, but I love snow blowers. My back loves snow blowers.
















I used our snow blower yesterday, and it was fun. I would have helped the whole block with their snow removal because I was having fun, but DH would not go inside no matter how cold he was (he is a diabetic and the cold really gets to him) until I was finished, so I stopped with the two houses next to us. But I could have done more. ; ))

The birds came to visit and one of the cats (Stanley) played in the snow. He was so funny, head out the door, wanting to go out, but every time his paws hit the cold, he hesitated. When we first opened the door, before he even tried to touch the snow, he shook each paw as if it were wet, and shook his head. We didn't make him go out, but he wanted to go so urgently that we finally encouraged him. We very slowly closed the door so that he knew he had to stay inside or take the plunge.

When he finally look the leap, he hopped like a bunny, trying, I suppose, to keep his paws warm/dry. Interesting tracks left in the snow .... That paw is moving so fast, you can hardly see it!

Speaking of tracks, I took some pictures of bird tracks left in just a dusting of snow on the deck. They seemd very large for such small birds.











After clearing the snow I went inside and took on the long delayed task of making the lining for the bedroom curtains I purchased months ago. I am very unsure of myself when it comes to both sewing and accurately measuring. This project is large and expensive if I fail, so I didn't get very far. I didn't even finish one curtain panel, but I did get started, and that's the second hardest thing to do. The hardest thing is to go back to something you've screwed up, at least as far as I am concerned. I hope I don't have to face that with this project.

I did a bit of spinning over the weekend. Said weekend was 3.5 days long! I was home Friday with a headache and 4 hours of furlough time. Monday was a snow day! Yippee! So, I spun each day over the weekend, more on the drop spindle that the wheel, though the wheel did come out on Sunday and Monday. I am making a 3 ply on the wheel, though I don't have a specific purpose for the yarn. I will be ready to ply some of the drop spindle singles this week and I can't wait! There was 2 ounces of this pretty blue fiber, so there won't be much yarn, but I can look at it, pet it, and perhaps use it to accent something else. I don't know, maybe there will be enough to make a small lacy scarf.

I took the plunge into the frog pond with DH's white sweater. His proportions have changed a little since I took his measurments, and I saw no point in his having a sweater that didn't fit well just so that I didn't have to rip. I am now back to creating rather than ripping.

The Honka scarf is slow going, but going. I am frequently too tired to concentrate that much at the end of a day, but I love it, so I shall persevere.

The Laminaria Shawl has come to a screeching halt. I was tinking due to some small error or another and lost a double decrease stitch, didn't realize it right away and now I have no idea what to do. I am waiting for the Knit Doctor to return from CA.

Rob's heel is turned and I can't wait to get to the section where I do the words. I hope he likes "Fear the Turtle". DH thinks he will.