Showing posts with label earflap hat. Show all posts
Showing posts with label earflap hat. Show all posts

Monday, November 16, 2009

Uh-oh. I missed a few days

I was making an unofficial (undeclared) attempt to "post every day for a month". I missed.

Nancy and I did not get to the Mannings on Friday for our field trip. They were holding a spinning class (it's a good thing Nancy thought of it and we called ahead) and they advised us to come another day. Instead we went to Cloverhill Yarn store since they are local and also sell spinning wheels. It wasn't totally wasted, but they only had 3 wheels on site. I am not sure that it was worth the trip to the other side of Baltimore on a rainy day. At least Nancy was familiar with the route for the next day's spinning class that she took there. Today she is headed for the Mannings to do that spinning wheel test driving that we had planned for Friday.



While at Cloverhill Yarn Shop, I bought some Galway yarn in beige for DH's warm hat. (I couldn't go to a yarn shop and not buy anything, could I?) I was so proud of myself for keeping with the color (actually a non-color - beige) that he told me in the past he wanted for a hat. He has changed his mind, now, and doesn't mind color (Grrrr). I have permission to add stripes of color as long as the pompom (we've heard the term Man Tassel recently) is beige. I knitted about 3 inches but had to start again, making it larger. That's what happens when you don't make a swatch.






I worked on the thrummed earflaps over the weekend but am not 100% satisfied and so I will keep working on it. The hat looks good, though.



Bob's He Gansey back is finished! I think the anchor looks awesome! I started on the front yesterday and have completed the double moss stitch area, am just about ready for the textured designs on the upper chest.





I have a dilemma with this sweater knitting. It is winter now, almost Thanksgiving. I think I can finish DH's white cotton sweater in a week or so. Certainly by T-day. Should I do that and get it done or, since it is winter, should I put the cotton one aside and knit on the wool sweater. It's going fast. I think I can get the front finished this week or by the weekend for sure. Then I will have 2 double moss stitch sleeves to go - surely that can be done in a couple of weeks. Maybe he needs the wool sweater more, despite the fact that I'd like to have the cotton one done and off my list. What do you think?



I met with younger son yesterday to discuss patterns and colors for his earflap hat and we settled on something we are both happy with. I will be knitting with alpaca again. : ))



The Sunshine sock in the purple yarn is looking good. It won't be a fast knit but it will be entertaining.

My new travel project (I am wearing the previous travel socks today) is the Chocolate Cherry Spiraling Corialis socks. The ribbing has been started and I think I can finish these off by Thanksgiving, too, assuming the normal traffic and waiting at appointments. That would be awesome!



Speaking of awesome, DH goes to see the audiologist tomorrow to get his cochlear implant activated (hopefully)! I can't wait to see what it does!



I made a bad choice re fishing this weekend. Sunday was wonderful and I had opted to stay home. Blegh! Oh, well. I did get to enjoy the sunshine and I got almost all of the clothes dried on the line. That's worth something, I think.



On Saturday, DH and I picked out new glasses. It is hard for him - without his glasses on, he can't see the frames he is trying. He had to go mostly by my opinion and that of the store clerk, and since he is looking to get bigger frames (he needs all the area he can get with the vision assistance) but not look like a bug-eyed fool, he was nervous. Why would he think that I would be willing to walk around with a bug-eyed fool? I do tend to like the more rectangular frames and he doesn't, so there is that, but once he told me how he felt about them, I did (reluctantly) put those aside. Well, choices were made and we get new glasses in 2 weeks.

Tuesday, November 10, 2009

05:50 is darn early

The Broncos let me down. Big time. It was not a good football weekend.


I managed to stay wake until the 3rd quarter before deciding that my need for sleep was stronger than my need to watch the rest of the (bad) game. I am really glad that I did not loose more sleep over that game.


KnitPicks interchangeable needle sets have given some people fits. I have had a few problems but not many. Last night made up for it, though it didn't have the disastrous consequences that it could have. The cables on two of my projects separated from the connector with stitches on the needles. Two. In the same night! Luckily for me, no lace was on those needles. Both the He Gansey and Rob's earflap hat were affected. I didn't lose any stitches, though, since I noticed it right away. Today there will be superglue application. I would say that I will start buying other needles and get rid of these, but I have quite a few - several Options, two new acrylic tips and a full set of the harmony needles. In order to not loose the use of all of those tips, I will use superglue and periodically replace the cables, I think. BTW, I like the acrylic tips.


So, the decreases on the top of Rob's hat were begun, and the He Gansey has reached the length specified in the pattern for beginning the arm gusset. We need an assessment to evaluate whether additional length is needed before we move on. I am exited because this is the beginning of the interesting part of the sweater.

Addendum - the length is good. On to the gusset.


One more inch of ribbing on the travel socks will finish this pair off. I have to choose another sock to work on since my LYS has not yet gotten the additional Chocolate Cherry Claudia's sock yarn in. I can't finish that pair until I have the extra skein of yarn. I still haven't decided whether the next sock will be stockinette (possibly in Ravens colors) or a Cookie A design.

It's time to go use the superglue.

Saturday, November 07, 2009

No boating today

The winds conspired against us. Winds that, 2 days ago were forecast to be 5-10 knots were, this morning, forecast to be 10-15 with gusts to 20 knots. I opted out, DH decided to give it a try. Once he arrived at the marina, though, he changed his mind. Other boaters who had been out (at this time of year there are not many, and they are the true diehards) were coming back in. The wind had truly picked up. DH decided he would stay in.

My knitting projects today included trying on the part of eldest son's earflap hat that I had knitted only to discover that, as I suspected, it was too loose. I frogged it and have re-knit it on 24 fewer stitches. I tried it on my head and it fits - I think it will do for eldest son, also. It looks good.


I worked on DH's He Gansey after I wove in the ends of the Elemental Boatneck. The finished garment will now go into the washer on the delicate cycle for blocking purposes. I will knit lots of He Gansey stockinette stitch. ; )


I sat in the sun on the deck for a while this afternoon and it was wonderful. As soon as the shade started to take over, though, I was cold and had to go inside. That makes me wonder about boating tomorrow. I had thought that I might give up watching the Ravens tomorrow so as to spend time with my honey doing something he loves. If I got cold in my yard at 2:30, what will happen on the water? Hmmm ... Warmth, sitting comfortably in my living room, watching TV and cheering the Ravens on vs. sitting outside, probably in the sun, spending time with DH, freezing my fingers off. I have a decision to make.

Friday, November 06, 2009

Another new project started

I cast on for eldest son's earflap hat. I am winging this design because I couldn't find a pattern that was just right. The yarn is Cascade 220.

Thisis the beginning of the hat. Since I am winging it, I decided to knit the cap first and pick up stitches to add the earflaps.

I took a pattern from the book I won at Knitters Day Out and then changed it up a little so that the lines of the design were thicker. We wanted the red yarn to be more significant.

It looks pretty good, I think. Now I have to hope that it fits. I had to add some stitches for the pattern repeat over what Ann Budds book of patterns said to cast on. I hope the fact that it's stranded color work will help. If not, it will be frogged and one less repeat included. I am no stranger to frogging, that's for sure.

The He Gansey is a little longer and will be worked on tomorrow on the boat.

Yes, it is just about winter and it's rather chilly outside now. It's supposed to get to 30 degrees tonight, but the forecast high for tomorrow is about 60. Hope springs eternal. We plan to go fishing tomorrow. That is, Bob will fish and I will knit and try to stay warm. It should be fine in the sunshine. It's later in the day, as the sun starts to go down that I will be cold.

If I am not frostbitten by the time we come in, I will fill you in on the days events. ; )