Showing posts with label slinky ribs. Show all posts
Showing posts with label slinky ribs. Show all posts

Monday, April 18, 2011

Good news and Bad news

It's a mixed bag in fiber land here in Maryland. I love the buttons that I chose for Slinky Ribs I had planned to wear it one day last week, but ..... It doesn't fit. The sleeves are perfect but the body of the sweater is too long in the arm/chest area. The neck line of the sweater, which is supposed to be low, hangs below the bust line and looks horrible. What this means, since the sleeves are picked up and knitted down from the shoulder, is that I have to rip back both sleeves and the top of the sweater down to where I started the neck opening and make that whole section shorter. My guess is that my row gauge was way off. I don't usually look at that because I can never get both row and stitch gauge correct with the same needles and stitch gauge is more important. In most cases. Obviously not more important in the this case, but equally important. I plan to put it away until I am less angry about the whole thing and then rip it out and re-knit. I will fix it, just not now.

There is also a  shawl, knitted in cotton/rayon, that I've been working on for a while. I discovered an error about 15 rows back. I'll fix that, too, but not right now. Frustration!

The good news is that I finished knitting the body of the vest and will begin the edging soon. I plan to block the vest first, sew the shoulders closed and then knit the edging, which has been narrowed down to either garter stitch or I cord. I hope to block the vest and Mom's hat one evening this week.

The other good thing is that I started knitting the IK cover sweater last night. It's the Leaf and Picot cardigan . I am using Silky Wool in blue. I've decided to knit the sleeves first, and I am knitting both at the same time on separate needles. I am alternating between needles/sleeves to keep them both at approximately the same place. I will plan to knit the back next, and the two fronts at the same time. For a change of pace I plan to knit the sweater as instructed in the pattern rather than change things around, knit in the round or knit the sleeves from the top down. I like the sweater just the way it is and seaming doesn't really bother me. Both sleeves are past the picot edging and about 1 pattern repeat into the lace.

In order to actually finish projects in a timely manner, I plan to concentrate knitting on the vest edging, the new sweater, a sock and the Saroyan scarf. I am hoping that not allowing myself to get sidetracked with other patterns will allow me to finish the vest by the end of May and the sweater by the end of June/early July.

Wind kept me from being able to skirt my fleece yesterday. I am hopeful that one day this week I will be able to do it when I get home from work, and then start the washing. I am sorta tempted to just wash the whole thing, but I am just getting impatient. Sigh. I'll be good.

I left work early on Friday so I could have some sunny outdoor time. I was able to do some weeding, dig out the boxes that the strawberries are growing in (from under the mound of mulch we covered them with last fall for protection from freezing) and place them on the deck. I also helped DH with some boat prep and just generally enjoyed being outside in pleasant weather. On Saturday, while it stormed, I worked from home to make up the time. That worked out very well.

Despite the soggy ground, I got in some weeding yesterday. I only spent about 15 minutes weeding because I've had so much trouble with my back in the last 2 months. I don't want to ruin the progress I've made with over-doing. If I can get out there 3-4 days per week and do that 15 minutes of weeding, I will get it done and not be miserable.
ETA I just got back from physical therapy and I was strongly advised not to vacuum in the house and not to exceed the 15 minute limit on weeding/gardening. The first will be much easier to do than the second.

DH is putting the boat in the water today. We had hoped to do it together yesterday, but the winds were not favorable. There's no point in making things harder for yourself. I wish I could be there with him. Darn this working for a living. : ((

I did some spindle spinning (Wensleydale) over the weekend and plied a bit more of the silk. I think one more plying session will finish off the silk that has been spun so that I can get back to the spinning of the remaining fiber.  I am sure that I won't have the chance to spin tonight but maybe a few minutes each night this week ....

Tuesday, February 01, 2011

Home Again

I am home from work again today. I am working from home, but not making the drive into Baltimore (35 mi. each way) on icy roads. My son literally slid down the driveway and had to walk in the snow on the front yard to get back up. The road is somewhat better, but it's not worth the risk to me when I can do work from home.

I have news on another almost FO. Last night I bucked up and picked up stitches to complete Slinky Ribs. I have completed it, actually, and wove in the ends, but I am not 100% happy. The pattern calls for stockinette edging, which was fine on the little button band. Around the neck, though, I might prefer ribbing. I plan to try it on and re-evaluate. The worst is over, though. I can leave the stitches that I picked up on the needle and just rip back to that first row, then rib the edging (3-4 rows) if desired. I think I'll try it on, block it, and then decide. Yippee! Almost there.

Next up - a lace shawl, the Honka scarf and maybe a 3/4 knitted vest ......

Sunday, August 22, 2010

I have a well rounded fiber life again. : ))

Lace is back in my life.

I am spinning, knitting lace, spindle spinning and finishing up projects on the needles. I finished the knitting of the V neck cardigan and it is blocking as I write this post. I can see myself in Montauk, going for a walk in the evening, pulling that sweater on to ward off the chill. (I hope it’s just a chill – we seem to be having signs of fall arriving and it’s only mid-August! I hope I won’t be wearing my winter coat)

The next thing to push to finish will be the Slinky Ribs sweater. So far one sleeve is elbow length and the other has about 2 inches knitted.

My lace knitting has not taken over my life but has a part in most days. I try to knit 4 rows each day and I am working on the shawl from Victorian Lace Today. It’s amazing how paying attention to my knitting avoids mistakes or lets me catch them right away. Giggle. I have to turn off my audio book when I knit on that shawl, but it’s worth it. I feel good that I am back to knitting lace again. I also picked up the falling leaves scarf I was knitting for Mom in the fall colors yarn with the silver thread.

Vacation is just a couple of weeks away. With Bob not working outside the home, he’ll be stuck with most of the prep work, but I have my share to work on. I haven’t settled on vacation knitting yet. I’ll be thinking about that over the next week or so.

One of my likely vacation projects will be a pair of socks for a trade. Molly at Celtic Swans doesn’t knit socks but likes to wear them. She makes beautiful knitting needles out of bronze (or silver) that I would live to have. I noticed a post on Knitters Review about the trade and apparently she has posted it on Ravelry, also. I have decided to take her up on it. She has chosen the Vampire Boyfriend socks from Knitty.com and Cascade heritage sock yarn in a kelly green color. I’ll probably work on those while on vacation. Cable sock knitting and vacation – I think that’s a great combination. ; )

I’ll have a shawl along. I don’t know if I will bring the one I am working on now or resurrect Laminaria and try to fix my mistakes on that one.

One requirement for vacation knitting (which is automatically also boat knitting) is a project that uses worsted weight yarn and has a fairly simple pattern. That may require that I start a new project. I have some yarn and ideas …. I did just order some yarn and found a pattern in a book I borrowed from the library that looks pretty simple to knit, though, so that might be the thing to bring along. Have to swatch before departure, though. If I don’t feel up to all of that, I can always bring along the afghan for eldest son.

Migraine prevention has been a goal of mine recently. I had so many migraines for a while that I used up my “allowance” of Imitrex. I tried Topamax but had some bad side effects and the doctor had me stop. I am now on verapamil and I have no side effects but I’ve had 2 migraines. The next question now is new medicine or up the dose? I’ll be putting in a call to the doctor.

My younger son has my camera right now, so there are no photos. Hopefully next week I can get someone to take a few photos of me in my new sweater in addition to getting some photos of my spinning projects and other things.

There has been no boating over the last two weeks. We had discovered a gas leak and Bob just finished putting the last seal in place yesterday over the gas tank. We may get in a couple more trips before vacation. I hope. : )

Sunday, June 27, 2010

The back yard

We moved the clematis from one end of the yard to the other last fall and I thought we would have to wait another season before getting blossoms on the clematis. Apparently it is happy in it's new home.



Mama (or papa - I can't figure out the difference) robin with food for the baby, and one of the three babies poking it's head over the edge of the nest, looking for food. The nest is on the deck support near the downstairs back door, and the adults complain every time we go in or out the door. I don't believe I told them where to put their nest ....










Blueberries. I can't wait!

Potato greens

Green beans

Cucumbers










Corn.
Green bell peppers. We planted a red and a banana pepper plant, too.
Tomato on the vine



One of nine tomato plants.





Hanging basket flowers - I love this combination










Hibiscus. This very afternoon, during a storm that deposited very little rain but apparently strong gusts of wind, this plant was decapitated. The trunk snapped right off at the dirt level. : ((

(These photos were loaded on Sunday and the post was written and posted on Monday.)

I finished plying my Rambouillet last night. I have 172 yds. of 3 ply. : )
The bobbins are empty and waiting for the Tour de fleece project.

The Mata Hari sock is ready for the heel and the Slinky Ribs top needs only about 1/2 inch more stockinette and the ribbing will start. I, however, and going to go knit a few rounds of spiral stole. Have a good Tuesday.