Showing posts with label escalator socks. Show all posts
Showing posts with label escalator socks. Show all posts

Sunday, March 29, 2015

I'm free!

I had my port for the chemo removed last Monday! It feels good to have "graduated" and gotten rid of that thing. It wasn't unpleasant and only mildly inconvenient but it was a symbol of cancer and I'm glad it's gone.

It was more painful than I expected getting it out.  I was sore but the discomfort gets less every day.  I will say that it is very strange hearing and smelling the cautery being used on my body .....

Somehow, I am not sure how or why, I contracted cellulitis in my elbow area of my left arm.
I first noticed pain and swelling there the day after the port removal. I didn't even look at it - just assumed I had banged my elbow in a stretcher or the OR table and it was bruised. By Wednesday, however, I was in a lot of pain. I looked at it and it was swollen, red and hot. The first thing they did was to get an ultrasound of the veins in my arm to be sure I didn't have a clot. Good news there. No colt. Next I saw my PCP who diagnosed/confirmed cellulitis, which is an infection in the skin and tissue, usually in an extremity. I am on antibiotics and it is finally improving, though Friday was a bad day. I was really sick.

I have an FO!  The Escalator Socks for DH are finished. This particular pair of socks has been on the needles for over 4 years so it really is a great accomplishment to finish. :-)

In my current WIP rotation is the I Want that Wrap poncho for Courtney (just over halfway) and Capall Dubh. The body is finished on the cardigan and the stitches for the sleeves have been picked up. I am now waiting for Angela to catch up and then we will zip down the stockinette sleeves.

I cast on in Fyberspates Vivacious 4 ply yarn in color 605 (greens and some browns) for the Axis fingerless mitts. I love this yarn I garter stitch but I am not sure this project will be finished. The gauge given in the pattern is 22 rows in 4 inches, so about 5.5 rows per inch. The increases are supposed to be every 8 rows for 5 repeats. That adds up to almost 8 inches. These are fingerless mitts! 8 inches before the thumb is separated? Something is wrong here, though no one else mentioned it in their project notes. I am already adjusting the pattern because I am using a different weight yarn but this is weird. I may frog this project. I hate to do that because I love the look of the mitts. Maybe I'll just make up my own thumb gusset positioning .... I hate to have to do that on a paid for pattern .....

ETA I did frog that pattern. I may try again in the called for weight of yarn but I don't know …. The gauge of yarn had nothing to do with the math being weird.

I am now using that yarn to knit Mulnomah. I love this yarn in garter stitch.

I joined another KAL. I know, I said I had to stay away from KALs but this one works well for me. It's a choose your own monthly challenge and for April I chose working on WIPs. I figure out how much yardage I have left on a project, then knit as much as I can on that project or projects through the month. At the end of the month I get points for yardage, weight of yarn knitted and other stuff. In May I choose another challenge and, since there are 15 to choose from, I think I can make the challenge fit in with my other goals for that month or quarter. Since I have to wait for April 1 to start that, I put aside my current WIPs for the weekend and cast on 2 projects - the Multnomah and the Nautilus Scarf .
both are smaller projects that should move pretty quickly but are very enjoyable right now.

We have daffodils coming up in the garden and yesterday we had snow off and on all day. But spring really is here. I was outside hanging clothes on the line to dry and my fingers weren't frozen when I came in. The clothes didn't freeze, either. (I have brought in sheets that were frozen stiff from being out there. We had to defrost them before we could finish drying them). I can feel the spring itch - I want to be gardening and I want to clean out closets and start knitting new things.

Enjoy your spring.

Thursday, March 05, 2015

It's Snowing.

It's cold and snowing. again. still. I am so ready for spring weather. I decided not to risk the drive to and from work today. It's a short distance but my car really does not do well on snowy and slippery roads and I can't afford to risk and accident. So I am home and plan to make the most of an extra day at home. I will do some chores and spin and knit my way through the day.

Knitting progress - I sent off the Low tide Cardigan in the pretty pink sparkly yarn to my friend, along with the sweaters for her twins.


The Low Tide was, as I suspected, too small. She sent it back at my request - I plan to sent it to my brother in the hopes that it will fit his daughter. I started right away on a new, bigger Low Tide
in a deep purple yarn (from stash!!! Yippee!!). The new Low Tide is almost finished. You can see the lace bodice (the stitches for the sleeves are still on holders in this photo) at the top and the stockinette body, which, due to increases at the front edge and decreases at the sides, curves towards the front. It looks very cute on but not so great in photos. This color is not true. It's a deep purple that I just could not capture correctly.


My Canadian Crazy Train socks are all finished. I have purple Iron Bridge socks (top picture) and purple Sole Train (lower picture) socks, knitted half by me and half by my train car mates. It was an enjoyable trip and I  hope to repeat it next year.

Capall Dubh Cardigan is getting a lot of time in my hands now that the low tide 2 is just about complete. I have completed the waist decreases and will begin the increases soon. I love the way this sweater looks so far and alternating skeins was the right way to go.



You can see here the stockinette front, the patterned back and a close up of the unblocked stitch pattern on the back and shoulders. 


Here you can see my 7th pair of Easy fingerless Mitts. They are belated holiday gifts for my co-workers. I was on a good roll with these before the holidays but when my brother became more ill and then died, I lost momentum. I have this pair and 1 more to knit, then a coffee cozy for the lone male in our department. 



The Escalator socks have been pulled from the depths of the UFO bin and are back in the line up. This is a close up of the stitch pattern. I have one sock finished and the cuff and one pattern repeat (about 20 rows) finished on the second sock. This color is not true either. It's a bit deeper, sort of like the deep red bricks you see some buildings made of. 


Another resurrected project has surfaced - out of need for a simple project to work on while I had a migraine. These are vanilla socks that were started and ripped out 3 times because I didn't like the pattern I selected. I am happy with the vanilla and it fills a knitting need. These will be worked on only when I need a simple knitting project. No counting or stitch manipulation except when it comes to the heels. Migraine project, while in a meeting or other situation where I want the knitting to be background and the conversation to be front and center. 



And just because it's snowing and I love feeding the birds on our deck, I thought I would share these photos. We have 2 Christmas trees on our deck just outside the kitchen door. We have red lights on them and keep them until the snow is over for the year. when snow comes (and in between, too) we feed the birds here. We put seeds in and under the trees and under the patio table so they have a dry, safe place to eat. They eat a bit, fly into the trees, eat more. It's a lot of fun to watch. Mostly we have cardinals, dark eyed juncos, wrens and sparrows. There are doves, an occasional black capped chickadee and probably some I just don't recognize. Oh, and the inevitable crows/ravens. 





Be safe and warm, have a happy day. 

PS the Love the yarn I own part of my 2015 goals is going pretty well. The knit on UFOs part is getting old. I can feel the craving to start a new project rising ......