Monday, November 28, 2011

Rob's Sweater

It's finished!!!!!  The yarn is Riverstone worsted by Louet. I used about 6.25 skeins, which is about 1275 yards and size 6 and 7 needles. I designed this sweater myself, with input from the recipient.  ; )
It took only a few months (rather than years) to finish! I hope to have a modeled photo soon. 



This is the plied Polwarth in purple pansy colors from Desigknit . That's right - I have a spinning FO, too, this weekend. ; ))  I loved spinning this fiber, both for the softness and loft it has and for the colors, which kept me endlessly entranced. I would love to spin the other pansy Polwarth fiber I have right away  ...... but I have to finish up another WIP first. The grafton batt is being spun into beautiful blue lace weight yarn and I am more than halfway there.



This will go into a bath today.  I had thought about a 3 ply but I wanted enough yardage to make mitts or a hat or something and a 3 ply would have made the yardage too short, I think. That's OK. I love it.

; ))


The Honka scarf (double knit, on the needles for 3 years) is moving along nicely considering that I have to knit on it only when I can concentrate. This is not one of those knit while chatting types of projects. I have to count every stitch and double check the pattern each time I knit a row. I love it, but it takes time and attention. I am using black cascade 220 and silk garden. You can see both right and wrong sides in the photo below.


This is the baby sweater I am knitting for Sharon. Her doctor had better be correct about the gender. It would be hard to put this on a boy.  I have another 2 inches to knit on the skirt and then the ruffle on the bottom. I haven't decided whether I will leave the sleeves short as in the pattern or make them long.

Brian's Binary Cable hat is finished, but I had a lot of yarn left. Since this is handspun, I didn't want to waste the remaining yarn. I decided to try a scarf. Brian had wanted a scarf to begin with but I was concerned about the itch factor (it really did feel itchy in a skein around the neck) so I convinced him to go with a hat. After knitting and washing, though, the yarn felt better so I decided to go for a coordinating (not matching) scarf.

 I used the same rib pattern as in the hat, and used similar cables, but not in the sequence specified in the hat pattern. I love the way the colors shift in the scarf.


You can see the cables more in real life, though they are not really very noticeable. It's the thought that counts. ; )


I had no intentions of starting a new project right now (finishing mode here) but I needed a boating project and at least this is a small one. It won't be unfinished for long. We went on the boat on Saturday and had a wonderful time. The weather was great for this time of year, we had no traffic and, thank goodness, no mechanical mishaps similar to this one. We drove down to Southern Maryland,  put the boat in the water and went striped bass (Rockfish in this area) hunting.  I knitted while Bob fished. I had better luck with my knitting than he did fishing, but we had a good day on the boat together.

Yesterday we got the front yard cleaned up again (it's amazing how many leaves there were on those trees!) and put the Christmas lights in the tree and on the bushes. The two wooden reindeer came out to play this year, too, with a spot light on each. It looks awesome at night!

Most of my holiday shopping is finished. I have a few more things to get, mostly things I can (and will) order on line.  Maybe we can get a tree today.


Friday, November 25, 2011

The Vest is finished


The vest is finished. I am very please with both the look and the fit. Considering that this was a first - knitted sideways, designed by me garment, I am very pleased.  The yarn is Domy heather in three shades of gray in a fibonacci stripe sequence. Here it is, pinned out for blocking.





Closer up view of the top and neckline:


Closer up view of the bottom edge, which I made wider than the other edges despite the torture of what seemed like endless tiny rows of garter stitch. ; )



Here is Brian's Binary Cable hat. It's a bit big for me but his head is bigger so I think it will be fine for him. this is handspun yarn, 2 different colorways plied together with a third, solid black. I like it a lot. I am going to try to design a scarf to go with it.  


We are off now to go boating. I hope we have luck with the fishing and have a good weather day. Have a good day.

Wednesday, November 23, 2011

Happy Thanksgiving to all

I do try to be thankful every day for the good things in my life, and I succeed most of the time. Thanksgiving day, tomorrow, was established especially to concentrate on those good things, though, and so I am going to be extra thankful tomorrow for:
1. My absolutely wonderful and loving husband. He has always taken care of and loved me and he continues to do so even though the taking care of part has become harder with his disappearing vision and hearing.
2. My sons.
3. My mother, who continues to be a great support system for me, listening when I need to vent, advising when I ask for it and just being there for me.
4. A job
5. A house to live in
6. Good friends
7. A country that, while it needs some (a lot) of change and compromise right now, is still a great place to live.

Tuesday, November 22, 2011

More FO's!!

Whew! My needles are over heating! LOL. I finished the vest. I hope to block it over the holiday weekend. Brian's Binary Cable hat is also finished and will get blocked soon. I was nervous about the fit of the hat - with just the cast on and first few rows of ribbing I thought it would be huge. Then, once I started to cable, I thought it might be too snug. I'm not sure yet about the snug because Brian was not available for a try on, but it's not huge and I think it will be OK. Now I need to choose a pattern for some fingerless mitts to go with the hat.

I bound off Rob's sleeves last night despite a frogging session due to a too wide sleeve. Just a collar to go!

The baby gift sweater has grown just a little. I really concentrated on the other projects this weekend, and on spinning my purple pansy polwarth. There's just a little bit more of that soft, fluffy fiber to be spun.

I plan to try to work on a finishing period for spinning projects, too. I feel scattered. The polwarth will be finished first, then the Grafton Batts I was working on before I started to polwarth. When I finish plying the grafton batt turned lace weight (I HATE to ply, so I am going to have to bribe myself) I will finish spinning the California Red that I had started over the summer. I want to try to clear off my bobbins and spindles by the new year and somehow get more organised with my spinning projects.  I want to plan more what I will spend my time on and what I will do with it when it's spun, even if that's to give it away or store for a future project.
Is this need to finish and organise a late mid life crisis? Am I turning over a new leaf? Or is this a temporary thing and I'll go back to my old ways in a month or so? I don't know but I am going with it for now because it makes me feel better about my life. Similar things are happening at home with the rest of my life, too, not just with knitting and spinning.

Thursday, November 17, 2011

Dreaming ....

The winter Twist Collective is up. I like so many of the projects in this issue! The one I like the best, though is Zosia . I like the fact that it looks comfy but fitted.  I love the cables and the simplicity of the ribbing that sets off the cables. I like the color, too, though that is very subjective. I think it will look great with the buttons at least partway open, which is how I would wear it very often, but having that high collar there to fend off nasty winds is a wonderful option.

My favorite non-sweater pattern is Caliope, the short version. I can see those socks knitted in several different color combinations. You could easily choose shades of the same color or contrasting colors (as shown). Neutrals (black and white, shades of grey, brown and tan) would also work well. There are more that I like a lot, but those two stand out for me.

My vest now has a front edging. I hope to pick up stitches for the bottom edging soon - maybe over the weekend. I knitted a bit on Brian's binary cable hat, too. It's just about time to start decreasing for the crown. Tonight at knit night I plan to knit on the baby sweater. It's a good knitting and chatting project. After knit night I will be watching the football game on TV and that knitting will be Rob's sweater sleeves. I include what to knit with/around just about everything I do. ; )

Tuesday, November 15, 2011

Project Resurrection

I am on a roll finishing up WIPs. This is very unusual for me - I do seem to finish 2 or 3 things close together but they are usually current projects that just end close together. This time I am actually enjoying pulling out these long term proejcts and getting them off the needles. I pulled out the sideways vest in fibonacci stripes over the weekend and added the edging around the arms. Last night I picked up some of the many stitches that will be needed to do the front edging. It will probably take several days, but that's OK. After all this time (3 years, I think) just having it out in the light of day making any progress is great! I think this vest will be finished by the end of the month (along with Rob's sweater. I haven't forgotten that and the sleeves grow a bit every day)

I was planning to take out a lace shawl next and work on finishing it, but I think I'll hold off on that. I just don't feel like knitting lace right now. After the vest I will work on the double knit Honka scarf that's been on the needles for at least 2 years.

I started the baby gift sweater and I like it. The color is good and the construction is easy. The sleeve stitches are on holders and I am working on the "skirt" part of it. I think the ruffles will take a while but the rest will be fast.

Today I leave work early to go get my root canal tooth filled. Finally! I had to take antibiotics last week for some pain in the tooth but it seems fine now.  I plan to get in an exercise walk right after that, before dinner. After dinner I get to help DH put some cement patch/leveler on the downstairs bathroom floor so that the floor tile can be put down.

We shopped for a refrigerator over the weekend. (Still shopping, haven't bought yet) Does anyone have any input into brand for reliability?  We are looking at Maytag, GE and Frigidaire. After reading reviews on line last night we eliminated Samsung from the mix and I've heard not great things  about parts for LG, so we eliminated that brand, too.  I am looking forward to a nice new French door fridge that will hopefully last at least half as long as our current fridge, which has been working well for over 30 years!!!!

Saturday, November 12, 2011

The five (or 6) year afghan is complete!

 Rob's afghan had had many starts and stops. Lack of interest, heat, being angry at him for something, etc. The last 3 years it was my boat knitting. The pattern was easily memorized and it utilized worsted weight yarn. On a boat underway, that's important. I made it in stripes, not squares to cut down on the seaming. (very good decision on my part)

Last night I finished the last seam and wove in the last of the ends. Today it gets a soak (being dragged around on the boat, to and from the boat made some parts of it a bit soiled) and will be stretched out to dry. Whew! I feel so good about this .....

ETA photo above.

 I settled on yarn and a pattern to knit for the baby gift I want to make. I love knitting with Mirasol Nuna, it's about the right weight and I found a color that I think the Mom will like. I plan to knit the Ruffles and Ridges baby sweater  in Nuna yarn in Aqua.  I'll search for buttons later. The color is actually a bit lighter than in this photo.
 Finished Marsan watchcap. I love the swirl decreases.

 This is the finished Canaletto Cowl. I love it.
 It's long enough to wear doubled around my neck or even doubled around the neck with a third loop over the head.

 This is my Polwarth spinning in progress. More spinning tonight, I hope.
 This is my Black Welsh Mountain sample skein. You can see the fuzziness, and it's prickly rather than soft fuzzy. It will become an outdoor garment.


I've knitted about 4 inches of sleeve on each side of Rob's sweater and I completed the cabled rows on Brian's Binary cable hat. Next up - either a lace shawl or the sideways vest that needs an edging will be resurrected. Woohoo! On a finishing roll!



I am off to start the weekly laundry battle, shower and shop for flooring for the downstairs bathroom. Have a good day.